gaf drip edge installation guide
drip edge extends out from the eave and rake edge, starter roll can be installed flush to the drip edge. Overlap joints in the drip edge by 2 inches. Allow ¼-in. 0000004003 00000 n
Plus, this step-by-step guide to drip edge installation will also explain how to cut drip edges for corners and peaks. clear all. Press down on the fascia until the drip edge is engaged. the rake, install Weather Watch ® XT Leak Barrier prior to installing drip edge. How to Install Drip Edge Flashing to a New Roof To install a drip edge on a newly constructed roof or on a re-roofing job, attach the drip edge along the roofâs eaves first. Concealed Joint Splice 4" Lengths (Not required for polymer clad materials) A. Roofing, Roof Insulation Align the Weather Watch ® XT Leak Barrier flush to the drip edge. Shingles, Roof Prepare roof edges - cant strips: install drip edge and install 9" cant strips of roll roofing material along the rake and eaves edges (gable ends and lower roof edge) such that the roofing strip overhangs the roof deck by 1/4" to 3/8". Use care to avoid wrinkling. Eave Installation⦠Remove the release film from the back of the roll and firmly press or roll the QuickStart® Peel & Stick Starter Roll into place along the eave edge. 0000044659 00000 n
R905.2.8.5, install non-corrosive, 26-gauge, sheet metal drip edge flashing (drip edge) along eave and rake edges for shingle installations. Shingle overhang should be greater than or equal to starter shingle overhang. Detailed Installation Instructions (Trilingual) Updated: 12/16. Roofing Project, GAF- Mastering The Roof (chapter 05)
The drip edge is critical to provide a finished look and to add waterproofing. GAF Thereâs a thread to this topic many years ago. Low-Slope Roofing Membrane, Roof Accessory
UNDERLAYMENT Malarkey makes two types of underlayment, the first being water-resistant, mechanically-attached field underlayments Right Start⢠UDL and our Secure Start® line of synthetic underlayments. According to most building codes, you need 1 square foot of ventilation for every 150 square feet of attic floor space. ter Course yment Start at either rake and lay in either direction 1/2" ( 13m m ) t yment Non-corroding Metal Drip Edge Start at either rake and lay in either direction 10" (254mm) For maxim um win d resistance along rakes, inst all GAF star ter strip shin gles with GAF Dura-Grip ® sealant o r cem ent shing les to und erlayment an d each othe r in a 4" (102mm) width of asph alt plastic cement. If itâs overweight, pry from the existing drip edge and re-install a brand new drip edge, using short galvanized nails and roofing cement to secure it. 3. Fasten sump core to the wood nailer with a min of (3) 1½-in. The roof leg should extend a minimum of 2â back onto the roof sheathing. 3. & Fastening, For Commercial Roofing Step One: If using a Type C drip edge, you can install a furring strip to increase its performance. to Buy GAF Products, News ��'A���a���Z�zBD���)V��c�)&vY�z�=�f�[m5�ǎ�>v�^c��6a�*��WVC,�ix��}���M�̜fn��`%Ŝ���/���"s�<2���ց���n�R�c�����/�]\���f��Tx�(� ���(�i:�$�%O3�[w�u`��R7��dC�aڠ�]c�BC{���)C��ZX�h�r�!0�A?�#.%ݒ�ۋ'bub�t)�Y�o���c�_)wy������kw���X��]j�p [(:��G6�����+Q�y�ң��s�N�}b��X�������^�Ƽ�Y}���bզU��i���y;�-�:+x���ي�NT�l�?fЌ����(�R�_�*$�Ȑ'��`\t@������v��p��*uӊҌ�"o+�:zC�[)*$7(+�|#���=E�I)�FS�C��tqUwIjإ�URp~{ϭ2�. Plus, this step-by-step guide to drip edge installation will also explain how to cut drip edges for corners and peaks. appropriate GAF Leak Barrier published application instructions for details. The installation of the leak barrier is necessary since it provides extra protection in ⦠Quick installation tips for installing GAF residential roofing materials. c) Over drip edge at eaves. Along eaves, put leak barrier* on top of non-corrosive metal drip edge. Step Two: Examine the drip edge. Install new drip edge on rakes and eaves. Step 3: Lay Out VersaShield® Fire-Resistant Roof Deck Protection⦠a) Parallel to eave⦠apply VersaShield® Fire-Resistant Roof Deck Protection without wrinkles or creases parallel to the eaves. Install drip edge first along the eaves, and later on the rakes once the field underlayment has been applied. �@�A�Q���a/c,�C��(cWc�LF�L�0��~,�Au2@}�O{��n312��� U�1�2I0F�\m��z� H3�v� %�)
endstream
endobj
54 0 obj
<>>>
endobj
55 0 obj
<>/Font<>/ProcSet[/PDF/Text]/XObject<>>>/Rotate 0/TrimBox[0.0 0.0 612.0 792.0]/Type/Page>>
endobj
56 0 obj
<>
endobj
57 0 obj
<>stream
2. the rake, install Weather Watch ® XT Leak Barrier prior to installing drip edge. The warranty can be registered online at the GAF ⦠The front venting face of the vent should be flush with the drip edge metal below. On the rakes, the drip edge goes over the membrane, so the roofers apply the membrane first. On rakes: install drip edge on top of the underlayment to stop wind-driven rain from getting underneath. In todayâs video we go over the basic techniques to installing drip edge and rake edge on your roof. 1. QuickStart le larmier fixé. Align the Weather Watch ® XT Leak Barrier flush to the drip edge. Fasten sump core to the wood nailer with a min of (3) 1½-in. Step 7 Asphalt Shingle Installation CLEAN UP AND INSPECTION: Your shingles will probably be laying over your drip edge and need to be trimmed. STEP 2: Installing Spring Cleat at Sump Core Butt spring cleat to the sump core. the Media / TV Clips. GAF recommends up to 1/2 inch overhang. Install drip edge first along the eaves, and lap the initial course of WaterGuard Rain & Ice over it. Nail one in the middle and one on each end of a 10' piece (approximately every 5') as overnailing can cause buckling. 2. WWW.GAF.COM Installation Guide for EverGuard Snap-On Fascia - Sump Cores & Spillouts STEP 1: Installing Sump Core Locate sump cores where downspouts will be located. Products, Systems & Accessories, Plan a Commercial
Narrator: On the eaves, the peel-and-stick goes over the drip edge (though there is some argument in the industry as whether this is the best way to install drip edge). Roofing, Insulation, Cover Boards
In addition to the requirements listed above, your Contractor must register and pay for this warranty within 45 days after installation. GAF Underlaymen t GAF Underlayment Start at either rake and lay in either direction Along rake, put non-corroding metal drip edge on top of GAF Roof Deck Protection. Systems, How Maintenance NOT stretch during installation. Drip Edge. GAF Lifetime Roofing System, Installing Metal Drip Edge Installing Complete Roofing Systems (Review #5) ..... 36 SECTION 3: INSTALLING SYSTEM ACCESSORIES Installing Leak Barriers..... 37-58 WeatherWatch ®, WeatherWatch XT, StormGuard®, Shingles), Three-Tab
3" side lap 6" (152 mm) end lap (914 mm) FeltBuster® High-Traction Synthetic Roofing Felt Along rake, put non-corrosive metal drip edge on top of FeltBuster® High-Traction Synthetic Roofing ⦠53 0 obj
<>
endobj
xref
53 19
0000000016 00000 n
b) Along the eaves and in the valleys, ... NOT STRETCH during installation. Find GAF's Specifications for EverGuard® Standard Drip Edge Fascia here Lengths of drip vary but typically it's sold in ten foot lengths (120"). No leak barrier. 4" (102 mm) minimum vertical lap Along eaves, put GAF Leak Barrier on top of non-corrosive metal drip edge.